PC Contact
Proposal · pages 1–7 + Appendix C3 Page 1
Proposal page 1: Title, team and abstract Proposal page 2: Technology concept and goal Proposal page 3: Bead substrate and limitations Proposal page 4: State of the art and targets Proposal page 5: Challenges, risks and work plan Proposal page 6: Related technologies and timeline Proposal page 7: Budget and team Proposal page 17: Appendix C3, the RBC bead fabrication process table
Scroll to read. Excerpt shared with contact details removed; references and team forms omitted.

The problem

The ISS grows food in systems called Veggie and the Advanced Plant Habitat. Both rely on clay “pillows” that crew members water by hand. In microgravity, water doesn’t drain the way it does on Earth. It clings in thin films around roots, so some roots drown, others dry out, salt builds up and the crew loses hours to upkeep.

What we proposed

Tiny porous beads, 1.2–1.8 mm across, made by dropping a mix of regolith simulant, biochar, zeolite and chitosan into liquid nitrogen. The air pockets keep roots breathing. A controller running on a Jetson Orin Nano reads moisture, pH, conductivity and flow sensors and adjusts watering on its own, using a hybrid of classic PID control and reinforcement learning.

Table titled Appendix C3, RBC Fabrication Process, with four steps: 1 slurry preparation, 2 controlled extrusion into liquid nitrogen, 3 freeze-drying, 4 sieving beads to 1.2 to 1.8 millimeters. Each step lists a description and its purpose.
Appendix C3, which I made: the four-step bead fabrication process, from mixing the slurry to sieving beads to 1.2–1.8 mm, with the purpose of each step.

My role

I owned visualization and data analytics for the team, about 7 hours a week, and made many of the proposal’s graphs. My job was to take dense technical targets and comparisons with today’s ISS systems and turn them into charts reviewers could read at a glance. One of mine was Appendix C3, the fabrication process table, which breaks a lab procedure into four steps and pairs each one with why it matters.

Targets

MeasureISS todayOur target
Moisture response time3–12 hours (manual)Under 5 minutes
Water-use efficiency~70%85%+
AutonomyUnder 30%90%+
Readiness (TRL)TRL 2TRL 4 in 12 months, $10K